This site has limited support for your browser. We recommend switching to Edge, Chrome, Safari, or Firefox.

$5 Flat Rate Shipping on US Orders

Use coupon code WELCOME10 for 10% off your first order.

Cart 0

Sorry, looks like we don't have enough of this product.

Products
Pair with
Is this a gift?
Subtotal Free
Shipping, taxes, and discount codes are calculated at checkout

Indicator, Long Leader, or Straight Down: Three Ways to Present a Lake Fly

A flat calm lake under morning fog, with a dark conifer shoreline in the distance

On a lake, three presentations cover the water: an indicator in roughly 15 feet and under, a floating line and a long leader deeper than that, and the fly hung straight down past about 20 feet. The method is chosen by depth and wind, not by the month.

Part 2 of 3The Stillwater Series · Part 1 · Part 3

Once the fly is at a known depth, you have one job left and it is the one nobody talks about: deciding what the fly is supposed to be doing down there. On a river the current decides for you. On a lake, every inch of movement comes out of your line hand, and the wrong movement is as fatal as the wrong depth.

There are really only three ways to deliver a fly into a lake's feeding zone and hold it there. Each one owns a depth range, each has a strike-detection problem to solve, and most anglers only ever learn the first.

Stillwater Snapshot
ZoneShoal through the drop-off into the near basin
Depth Range4 ft on the shoal out to 25 ft-plus off the edge
Line & Sink RateFloater for indicator and long-leader work; intermediate (~1–1.5 ips) for the shoal; Type 6–7 for hanging vertically — nominal figures to calibrate
RetrieveStatic hang, figure-eight, slow strip, or long draw with a pause
Best WindowThe whole open-water season; method is chosen by depth and wind, not by month
Skill LevelIntermediate

Why Your River Instincts Fail Here

River presentation is subtractive. The current already moves the fly, so your work is mostly about removing the things you're adding — mending out drag, managing slack, keeping the line off the fast seam. Do less and you usually do better.

Lake presentation is additive, and that reverses the instinct. Nothing happens unless you make it happen, so anglers who are good at rivers arrive and immediately overdo it: the cast lands and the stripping starts. But almost nothing a trout eats in a lake moves quickly. Chironomid pupae ascend at a rate that looks like nothing at all. Scuds potter. Damsel nymphs wriggle shoreward in short bursts and rest constantly.

So the first correction is almost always downward — slower, and then slower again. The second is patience before the retrieve even begins: on a sinking line in fifteen feet of water, the fly may need a minute or more to arrive. That is a long time to sit doing apparently nothing, and it is the single most common place a lake day quietly goes wrong.

Depth First

Step One

Depth

The method you choose is dictated by depth before anything else. Roughly 15 ft and under is indicator country. Deeper than that, a floating line with a long leader starts to make more sense. Past about 20 ft, hanging the fly vertically beneath the boat beats trying to cast to a depth you can't hold.

Step Two

Pattern

The delivery method constrains the fly. A static hang under an indicator wants a pattern that works while doing nothing — a chironomid pupa, a balanced leech. A retrieve-driven method wants something that comes alive when pulled. Choosing a fly that fights its delivery is how anglers end up blaming the pattern.

Step Three

Retrieve

Then pick the hand movement from the food item, not from a speed ladder: static hang for ascending pupae, figure-eight for scuds and cold water, slow strip for emergers, long draw with a pause for leeches and damsels, fast strip for fry and attractors. Cycle through them deliberately and let the fish confirm the choice.

The meta-skill here isn't any single retrieve — it's being willing to work through them, giving each a real trial before ruling it out. Changing your retrieve is a genuine diagnostic move on a lake, in a way it never is on a river.

Reading the Lake

Method follows water depth, so the zone map from Part 1 doubles as a method map. Over the shoal in four to twelve feet you can do anything — indicator, long leader, or a slow intermediate crawled over the weed tops. Along the drop-off edge, the long leader and a countdown on a sinking line both come into their own. Out past the edge, in twenty feet and more, your options narrow fast and hanging vertically becomes the honest answer rather than a gimmick.

Wind decides as much as depth does. A stiff blow makes long leaders and indicator rigs miserable to cast — overpowered casts throw tailing loops, tailing loops become leader tangles, and surface chop starts dragging the whole rig off its depth. That's the day to shorten up, go to a sinking line, and let the drift do some of the work. Flat calm is the opposite problem: easy casting, spooky fish, and takes so subtle you have to watch the line rather than feel it.

Low sun over a mountain lake throwing glare across the surface — reading the line for subtle takes, stillwater fly fishing, Fly Fishing Insider Podcast
Flat calm and low light: easy casting, spooky fish, and takes you read on the line rather than feel in the hand.
Shoal
Sunlight reaches bottom
Drop-off
The travel edge
Basin
Deep refuge
8 ft
16 ft
24 ft
Every location call in this post names one of these zones. Depths are the shape of the model, not a measurement of your lake — go find your own break.

Step-by-Step On the Water

  1. Pick the method from the depthMeasure the bottom first, then choose. Shallow means indicator; mid-depth means floating line and a long leader; deep means hanging vertically. Don't force one method to cover the whole lake.
  2. Build the leader for the jobUnder an indicator you want a short heavy butt and a long level section so the rig hangs vertically. For the long-leader method it's the reverse — a tapered leader of fifteen feet or more, whose changing diameter slows the sink and lets you track the fly back through a zone.
  3. Cast, then do nothingLet it sink. Sit down, cross your legs, eat your sandwich. The fly cannot fish at the right depth until it has arrived, and every second you shave off the sink is a second spent above the fish.
  4. Time the sink with the second handCounting in your head drifts as the day wears on. Use a watch, keep yourself honest, and write down the count that produced a fish so you can reproduce it.
  5. Start slower than feels rightWhatever pace you think is slow, halve it. Then keep it there long enough to be a real test rather than a token gesture.
  6. Read the line, not just the indicatorOn a calm day, leave a small squiggle of slack line on the surface. If you're moving the fly slowly enough that squiggle stays put — so when it starts to straighten, something at the other end is pulling. That's your take.
  7. Fish the hangAt the end of the retrieve, pause with the flies still down and let them rise slowly. Followers that wouldn't commit to a moving fly often eat the moment it stops and lifts.
  8. Sweep, don't liftLong leaders and slack mean a vertical lift just takes up line. Set with a low sideways sweep of the rod to move the hook rather than the leader.
Target depth Intermediate
~1.5 ips
Type 3
~3.0 ips
Type 5
~5.0 ips
Type 7
~7.0 ips
4 ft 32s 16s 10s 7s
8 ft 64s 32s 19s 14s
12 ft 96s 48s 29s 21s
18 ft 144s 72s 43s 31s
25 ft 200s 100s 60s 43s
Sink rates on the box are nominal. Fly weight, leader, wind drift, and water temperature all move the real number — start with the count here, then calibrate it on the water until you can hit the same depth twice.

The Conditions Dial

Wind

A light chop is a gift — it animates the fly for you, keeps the line straight and hides you. In a hard blow, abandon the long leader before it abandons you: shorten up, go to a sinking line, fish the drift, and consider a drift sock to slow the boat.

Light

Low light spreads fish out and shallower, which favours covering water with a slow retrieve on an intermediate. Bright sun concentrates them deeper and tighter to structure, which favours a held depth — indicator or hang — over searching.

Clarity

In clear water, lengthen the leader and lighten the tippet, and expect refusals at the boat — the hang matters more. In stained water, shorten up, fish something that displaces water, and pulse it: the fish needs to find the fly before it can inspect it.

Temperature

Retrieve speed scales with water temperature, not with your patience. Below about 50°F, near-static is often the only thing that works. Through the 50–65°F band you can afford movement. Above roughly 61°F at the surface (66°F for browns), current thermal guidance says weigh whether to fish at all.

Common Mistakes

Mistake — Retrieving the moment the fly lands

The cast goes out, the line hand starts working, and the fly never gets below the top few feet of a fifteen-foot column.

Fix

Count the sink deliberately before the first pull, every cast. If that feels like wasted time, that feeling is the problem — it's the part of the cast that's actually fishing.

Mistake — Moving the fly too fast

Lake food doesn't sprint. A retrieve that feels natural to a river angler is usually several times faster than anything a trout is watching.

Fix

Use the surface squiggle as a speedometer on calm days: if the slack is being pulled out of your line, you're dragging the fly, not swimming it.

Mistake — A hinging indicator rig

The indicator sits ten feet or more from the fly line, so the cast folds at the hinge and the flies land in a heap well short of vertical.

Fix

Peg the indicator close to the fly line and run level tippet below it. The rig then casts as one piece and hangs straight down where you set it.

Mistake — Lifting into the take

A river hookset goes up. With twenty feet of leader and a soft take, up just removes slack and the fish is gone before the hook moves.

Fix

Sweep the rod low and to the side. It comes tight along the line instead of hinging it upward, and it keeps the fly in the zone if you miss.

Mistake — Abandoning a method too early

Five minutes of long-leader work, no take, back to the indicator. Nothing gets a fair trial, so nothing produces.

Fix

Give each method a real block of time at a known depth. If depth, pace and pattern all check out and fifteen minutes pass, the answer isn't the method — it's that there are no fish there. Move.

Author's Story & Key Insights

Across two long conversations for the podcast — Episodes 110 and 111, recorded with Greg Keenan hosting — Phil Rowley made a point that reorganised how I fish lakes. Asked what he'd do if he could only fish a lake one way for the rest of his life, he didn't pick the indicator. He picked a floating line and a very long leader.

That surprised me, because indicator fishing is what most of us think stillwater is. His reasoning was about control. With no indicator on the leader — he calls it fishing naked — you're playing four variables at once: the weight of the fly, the length of the leader, how long you let it sink, and the speed of the retrieve. Get those right and you can track a fly back through a chosen depth band for the whole length of the cast, rather than parking it at one fixed point. It covers chironomids and almost everything else that swims or crawls in a lake.

The cost is that it demands two things anglers find genuinely hard: patience, because you may wait a minute or more before you touch the line, and touch, because a take at twenty feet of leader is nothing more than a small squiggle of line quietly straightening out on the surface. He's blunt that the indicator earns its place precisely because it shortcuts both — it holds depth for you and it shows you the take. It's a learning tool that happens to also be deadly.

Then there's the third method, which he only demonstrates last in his own seminars, for a reason. Hanging the flies vertically under the boat in twenty feet or more produces takes so violent they're comic — he describes rod tips being yanked from just above the water down past the angler's knees in the space of a blink. He shows it last because if he showed it first, nobody would bother learning anything else.

The Episodes Behind This Post

Phil Rowley, Parts 1 and 2

Fly Fishing Insider Podcast, Episodes 110 and 111 · hosted by Greg Keenan · Rowley is the author of The Orvis Guide to Stillwater Trout Fishing
Pro Tip from Christian

On a flat calm morning, stop staring at your indicator and start watching the two feet of fly line closest to it. The squiggle of slack sitting on the surface is the most honest strike detector you own — and it tells you something the indicator can't, which is whether you're moving the fly too fast. If that squiggle is disappearing as you retrieve, slow down.

Terms You'll Hear

Naked technique
Fishing a long leader with no indicator on it, controlling depth through fly weight, leader length, sink time and retrieve speed.
The hang
Pausing the flies near the boat at the end of a retrieve and letting them lift. A British reservoir habit — followers commit when the fly stops and rises.
Dangling
Fishing the fly vertically straight down beneath the rod tip on a fast sinking line, usually in twenty feet or more.
Washing line
A rig using a buoyant fly at the far end to suspend nymphs horizontally at a chosen depth, like clothes on a line. Also British in origin.
Figure-eight
A continuous slow gathering of line into the palm — the slowest controllable retrieve there is, and the right one for scuds and cold water.
Long draw with a pause
A long pull followed by a genuine stop, letting the fly settle before the next. The retrieve for leeches and damsel nymphs.
Drift sock
An underwater drag chute that slows and steers a boat's drift in wind. British anglers call it a drogue.
Sweep set
Setting the hook with a low sideways rod movement rather than an upward lift, so the hook moves instead of the slack.

Recommended Fly Patterns

Each of these is picked for a delivery method, not just a bug. The retrieve is named because on a lake the retrieve is half the pattern.

Brown Mohair Leech, Size 8 (3 Pack)
The long-draw-with-a-pause fly for 8-20 ft along the drop-off edge. The mohair body and marabou tail keep moving on the pause, which is where the eat usually comes.
Starting from $8.49Shop Now
Black Red Crystal Mohair Leech, Size 8 (3 Pack)
The stained-water and low-light version of the same job. Black with red and crystal flash, worked with long draws in 8-20 ft when the fish need to find the fly before inspecting it.
Starting from $8.49Shop Now
Black Mohair Leech, Size 8 (3 Pack)
My searching leech for 12-25 ft off the edge. The mohair body and marabou tail keep pulsing on long pulls behind a fast sinker, and it still has life in it when you hang it vertically for deep fish.
Starting from $8.49Shop Now
Olive Beaded Shrimp Scud, Size 12 (3 Pack)
Shoal fly for 3-10 ft on an intermediate or a long leader. Center beaded to get down quickly, and scuds are in that weed all season. Short slow draws with rests, never a continuous strip.
Starting from $7.49Shop Now

Recommended Gear

An honest note: we don't stock slip indicators or a purpose-built stillwater indicator leader. Build the indicator rig yourself — short heavy butt, long level tippet, indicator pegged close to the fly line — and put your money into the lines that let you change methods at all.

Wild Water 7wt Intermediate Sinking Line, Clear
The shoal-searching line for 2-10 ft. A full-sinking intermediate at 2.5-3 in/sec, slow enough to hold a band through a whole figure-eight retrieve, and it gets the line under surface chop so wind stops dragging your presentation around.
Starting from $25.00Shop Now
Wild Water 7wt Fast Sinking Line
The line for counting down to 15-25 ft and for hanging vertically off the edge. Full sinking at 5 in/sec. This is the one that makes the third method available to you at all.
Starting from $22.00Shop Now
Moonlit Interchangeable Sink Tips
S2 and S3 tips that clip onto your floater, so one spool covers both the long-leader game and a counted-down shoal presentation. The cheapest way to add a depth option before buying a second line.
From $5.48Shop Now
Rising Boat Net Package
A deep 16" bag matters most on the hang, when a fish eats three feet from the boat and runs immediately. The 38" handle reaches past the gunwale without you standing up in an anchored boat.
$334.00Shop Now
The Stillwater Series

Go on a fly fishing trip you'll never forget

We partnered with Frontiers Travel to put you on water that's worth the flight. Tell them where you want to go. Don't wait.

Book a Trip

Fly Fishing Insider Podcast has a referral partnership with Frontiers International Travel. If you book after being introduced through us, we may receive compensation at no additional cost to you.

Tight lines, everyone!

Depth got the fly there and presentation kept it there. Part 3 takes on the last variable — which fly, and why the obvious answer is sometimes wrong.

FREE GUIDE

Top 100 Tips and Tricks from Guides

On-the-water lessons from 28 guides, captains and outfitters who have joined the Fly Fishing Insider Podcast.

  • Reading water, nymphing, dry flies, streamers and the swing
  • Stillwater, warmwater and saltwater flats, plus casting and rigging
  • Every tip links to the full episode with the guide who shared it

It's on the way!

Check your inbox for your copy (and a few bonus tips over the next couple of weeks). Want it right now?

Download the guide (PDF)
Christian Bacasa, Host of the Fly Fishing Insider Podcast  |  ffipodcast.com